Camera hut progresses

THE SERG PORTABLE BROADCAST HUT.

As most of you will never see this I thought that I might give you a glimpse.
A number of members have put a great deal of work into this project, particularly Peter, VK5BE and Nick, VK5NJS.


The cable shelving, (built by Greg, VK5ZGY), at the rear on the left hand wall. The steel cabinets for sundry items. The air conditioner will be removed as it is too big. The hooks for sundry items on the back wall made by Nick, VK5NJS.

The operating desk made by Owen, VK5HOS, and Andrew, VK5MAS. (Note the clever recessing of the console to allow the operators wrist and hand to remain on the desk).

There is still a lot to do but we appear to be well on track for its first outing at the Legend of The Lakes Hillclimb in November.

President Peter

Total Page Visits: 2159 - Today Page Visits: 25