Working bee at Mt Richmond

1/5/23 – Peter VK5BE and Nick travelled to Mount Richmond to install the newly constructed steel work on the bunker wall that will support the 4 solar panels.

Firstly, an off-set support frame was attached to the bunker wall, then a tilting solar panel mounting frame was attached. The frame tilts to the optimum positions for maximum efficiency for either summer or winter.

During the next site visit, it is hoped the 4 solar panels will be mounted and cabled into the hut.

Nick hard at work welding up the frames
Total Page Visits: 70 - Today Page Visits: 1