Working bee for path

On Sunday 3/7/22 a working bee was held at The Bluff repeater site to create a path to our building. In winter the old path became wet and overgrown with weeds.

Chris VK5MC contributed suitable material (Scalps) and then the merry gang of Peter VK5BE, Tim VK5AV, Col VK5DK, Owen VK5HOS and Chris VK5MC spread the material while John VK5DJ did a software update of VK5RMG. In addition Peter dug out room for the drain from the building below path level and overcome a trip hazard. Great job fellas.

Total Page Visits: 137 - Today Page Visits: 2